Roof Tear-Off Calculator

Estimate the cost of removing existing roofing. Enter your roof area, layer count and removal rates, then add disposal, equipment and a contingency allowance.

Multiple roofing layers ft², m² & roofing squares Your rates, your estimate

Enter your project details

Use the actual roof surface area being stripped. Pricing fields use your own quotes or budget allowances.

Changes the currency label; no exchange conversion.
Include roof slope. Do not add new-material waste.
Assumes every layer covers the same entered area.
Removal charge for the first layer only.
Not needed for a one-layer tear-off.
Enter the total for all layers, if charged separately.
Only costs outside your entered removal rates.
For example, separately quoted cleanup or access costs.
Example allowance. Adjust for your project.
Avoid counting costs twice. If a removal rate already includes hauling, equipment or cleanup, leave the corresponding separate cost at zero. Zero means no separate allowance is added.
How to use this tool

Build your removal budget in three steps.

01 / MEASURE

Enter the roof area

Use the surface area being removed, including roof slope. A roofing square equals 100 square feet. Enter the area once; the calculator accounts for the layer count separately.

02 / PRICE

Separate the layer rates

Enter a first-layer removal rate and, for multiple layers, the rate for each additional layer. These can be different or the same, depending on your quote.

03 / COMPLETE

Add separate project costs

Include disposal, equipment and other charges only when they are not already in your rates. Set your contingency percentage and calculate the full allowance.

How tear-off cost is calculated

Every layer is assumed to cover the same roof surface area. Additional layers share one rate per area unit.

First-layer cost
Roof area × first-layer rate

Additional-layer cost
Roof area × (layers − 1) × additional-layer rate

Subtotal
Layer removal costs + separate project costs

Estimated total
Subtotal × (1 + contingency ÷ 100)

Example tear-off estimate

Assume a 2,000 ft² roof with two existing roofing layers. Use an illustrative first-layer rate of $0.75/ft² and an additional-layer rate of $0.35/ft².

First layer: 2,000 × $0.75 = $1,500
Second layer: 2,000 × $0.35 = $700
Disposal: $500
Equipment and other costs: $200
Subtotal: $2,900
Contingency at 10%: $290
Estimated total: $3,190

These figures demonstrate the calculation only. They are not current market prices or recommended contractor rates.

Common questions

Roof tear-off Calculator FAQs

Understand the quantities and costs behind your estimate.

What is a roofing layer in this calculator?

A layer means one existing covering layer being removed, such as one layer of shingles. Use the same definition as your contractor's pricing. Do not automatically count underlayment or roof decking as additional shingle layers.

What if only part of the roof has two layers?

Calculate each section separately using its own area and layer count, then combine the estimates. Allocate shared disposal, equipment and other fixed costs once so they are not counted twice.

My quote gives one removal rate for all layers. What should I enter?

Enter that combined per-area rate in the first-layer rate field and enter zero for each additional layer. Keep the actual layer count for the area summary. Do not enter the combined rate again as an additional-layer charge.

Should I add a waste percentage to the roof area?

No new-material waste factor is needed for this calculation. Use the actual existing roof area being removed. Contingency is a separate financial allowance and does not increase the measured area.

Does changing units change the estimated cost?

Changing the area unit converts the entered roof area and per-area rates together, preserving the estimate apart from rounding. Currency selection only changes the currency label; it does not convert money.

Does this include roof replacement or debris weight?

No. This tool estimates removal costs from your inputs. Replacement materials, installation and deck repairs need separate allowances. Debris weight and container requirements depend on the materials and the waste provider's limits.